  • 1.  CMA Pop Quiz- Q&A 265

    Posted 12-14-2018 12:19 PM

    CMA Pop Quiz: Are you preparing for the #CMA exam? Take our #CMAPopQuiz!

    v2ukFNGKSZyn5RWM7HpF_CMA-Pop-Questions_265.jpg



    ------------------------------
    Christine Purelis
    ------------------------------


  • 2.  RE: CMA Pop Quiz- Q&A 265

    Posted 12-14-2018 05:42 PM

    CMA Pop Quiz: How did you do on our #CMAPopQuiz? #CMA

    RaQ6Lt5YSwqRw9eNm0vX_CMA-Pop-Answer_265.jpg



    ------------------------------
    Christine Purelis
    ------------------------------



  • 3.  RE: CMA Pop Quiz- Q&A 265

    Posted 12-15-2018 02:20 PM
    Though I agree with D as the answer, the solution doesn't appear to fully capture the related costs.  For Vendor P, in order to obtain 100,000 switches with a 90% pass rate, you would have to test 111,111 (0.9 x 111,111 = 100,000) switches, not 110,000.  The formula should use the term 100,000 / 0.9 in place of 100,000 x 0.10.  This results in a total cost of $4,166,660 for Vendor P, instead of $4.1 million.

    Jeremy





  • 4.  RE: CMA Pop Quiz- Q&A 265

    Posted 12-23-2018 10:50 AM
    why is the $35 re-accounted for when determining the cost of failure? isn't it already taken into account with the initial purchase of the switches?

    Thank you, 
    Jessica Clayton

    ------------------------------
    Jessica Clayton
    Student
    Blairsville PA
    United States
    ------------------------------



  • 5.  RE: CMA Pop Quiz- Q&A 265

    Posted 12-26-2018 09:32 AM
    Hi Jessica,
    The $25 charge is the lost productivity, the additional $35 is the cost for the replacement switch … so the production line has to remove the failed switch and replace it, therefore the product in effect used 2 switches to get one that worked.​

    ------------------------------
    Martha Devereux-Poch
    Lead Financial Analyst
    Aurora IL
    United States
    ------------------------------